• Home
  • High Adventure
    • David Hamilton
    • Seven Summits
    • Climbing resume
    • Ski Mountaineering
  • Current Projects
  • Expedition Reports
  • Speaking
  • Contact
  • News

Report Menu

Carstensz 2010
Norway Ski 2010
Vinson Ski Tour 2010
South Pole 2009
Carstensz 2009
Gasherbrum II 2009
Everest 2009
Antarctica 2008/9
Rush Peak Trek 2008
Mongolia 2008
Everest South Col 2008
Ski South Pole 2007/8
Vinson 2007/8
Rush Peak Trek 2007
Muztag Ata 2007
K2 Base Camp Trek 2007
Ski Turkey 2007
South Pole 2006/7
Vinson 2006/7
Cathedral Peak 2006
Muztag Ata 2006
Alaska Denali 2006
Ski Greece 2006
Vinson 2005
Patagonia Trek 2005
Spantik 2005
Everest 2005
Ski Corsica 2005
Ecuador 2004
Shishapangma 2004
Karakoram Ski 2004
Ski Iran Damanavd 2004
Ski Ararat 2004
Ski South Pole 2003
Vinson 2003
Chinese Side of K2 2003
Muztag Ata 2003
Greenland 2003
Everest 2003
Ski Corsica 2003
Uganda 2003
Everest 2005 Print

Everest 2005

Report to follow.

 

Click on images to enlarge.

Expedition members at the Summit Hotel Kathmandu

Tibetan traders on their way to set up shop at Everest Base Camp

Base Camp (5160m) in Tibet on the North side of Mt Everest

Advance Base Camp (6500m)

Climbing the fixed ropes to the North Col

Camp 1 on the North Col (7050m)

Climbing on the North Ridge above the North Col

Morning sun on the summit slopes above the Third Step

The final slopes: less than 50m from the summit width

Mt Everest summit 06.15 on 3rd June 2005

 

Copyright © 2010. David Hamilton, High Adventure  ::   Website by Jenkin Hill Internet  ::  Sitemap